PRELIMINARY — FOR BIDDING / ESTIMATING ONLY · NOT FOR CONSTRUCTION · REQUIRES INDEPENDENT PE REVIEW & SEAL
▲
ArmorDraft
Fire-Protection Design & Estimating
AI-assisted fire-protection estimating
Bid fire-sprinkler & alarm jobs faster — preliminary layouts, hydraulics, NFPA checks, and a priced BOM.
A design-support tool that accelerates the quote. Every output is preliminary. It is not a
stamped or sealed engineering document. It must be independently reviewed and sealed by
your licensed Professional Engineer.
● Hydraulics — Hazen-Williams
Friction loss (SI in, imperial out). Internal diameter, not nominal.
● NFPA Compliance Check
Sample LH sprinkler set vs. the live NFPA-13 rule store (post-hoc backstop).
● BOM Parity Gate
Every design node must trace to a BOM line; per-segment LF ≤2%.
● Priced Estimate Export
Material + labor totals, with the mandatory preliminary disclaimer.